JFK Terminal 6 Design-Build Project
The AECOM team selected AEA to provide Traffic Analysis and Modeling services for the JFK Terminal 6 Design-Build project!
The AECOM team selected AEA to provide Traffic Analysis and Modeling services for the JFK Terminal 6 Design-Build project!
As a part of the WSP team, AEA will provide various engineering design services for the JFK Redevelopment Master Planning project! Design services include Maintenance of Traffic (MOT) design, 3D utility modeling, and electrical design review.
AEA was selected as a prime consultant to provide Stage I engineering design services for PANYNJ’s Lincoln Tunnel Replacement of Intelligent Transportation System (ITS) Project. This project features over 100 ITS devices located throughout the facility and on neighboring roadways.
Port Authority selected AEA to provide AEA selected for providing engineering support services relating to the development of Performance Measures for the Port Authority Agency Operations Center (PA-AOC).
AEA selected by PB-HOK Joint Venture to provide ITS, Lighting, Electrical and Maintenance of Traffic design and construction support services for LaGuardia Airport Central Terminal Redevelopment Project in New York
Port Authority selected AEA as As sub consultant to Gannett Fleming Engineers and Architects, P.C. (GF), to provide electrical engineering design services to the for replacement of Newport Station Escalators and Elevators and for replacement of existing Harrison Car Maintenance Facility (HCMF) Elevators located in the PATH Harrison Station.