PANYNJ-Rehabilitation and Repaving of the Helix (PID #06494000) LT-234.026

CLIENT

Port Authority NY/NJ

Relevant Project Components

    • Port Authority Experience
    • PA CADD Experience
    • Electrical Design and Power Distribution
    • Construction Cost Estimates
    • Single Line Diagrams
    • Conduit and Cable Schedules
    • ITS

PROJECT DESCRIPTION

As sub consultant to HNTB, AEA developed final design drawings and construction details to PANYNJ for the replacement of Transmit™ (EZ Pass Tag Readers) equipment located at the Lincoln Tunnel. AEA provided final design services to develop Post Award Contract Change (PACC) documents necessary for the repair and construction of two (2) existing Transmit™ system sites located at/near the PANYNJ Lincoln Tunnel.  Developed construction plans and contract documents for the installation and repair of (2) existing TRANSMIT™ sites owned and operated by the PANYNJ.  Performed close coordination with HNTB, TRANSCOM and the PANYNJ. The site Badger Reader™ equipment and antenna lane kits were identified replacement at the roundabout for the lower JFK Boulevard and I-495 interchange, and along the façade of the NJ side of the Lincoln Tunnel (center tube) Portal.  AEA developed design development packages and construction documents. Performed voltage drop and conduit fill calculations. Calculated conductor sizing and overload protections. Supported Baker team on specifications and cost estimates.