New Jersey Department of Transportation
AEA completed the final design and post design services for Cokesbury Road over I-78 Bridge Deck Reconstruction and Miscellaneous Repairs project as prime consultant. Project was completed on time and within budget. The deck replacement would extend the bridge’s useful service life and provide the estimated costs to accomplish the work. The bridge was constructed circa 1968, and consists of four (4) spans and is 231 feet long and 55 feet wide, and provides one northbound through lane with a shoulder, one southbound through lane, and one SB acceleration lane.
The results of the evaluations / investigations performed on the project were presented in a Design Recommendation Summary Report which was reviewed by NJDOT and FHWA. Upon approval of the recommendations / strategies presented in the report, final design was authorized and contract documents were prepared for the work.
The following major items of work were accomplished:
All design work performed using AASHTO LRFD specifications and NJDOT Design Manual for Bridges and Structures. Also, provided Construction Support Services include reviewed shop drawings, responses to Contractor’s RFI and consultation during the construction.